Friday 7 November 2008

the last few days 1...






Things have been busy this week at The Factory so have not uploaded in a while - here is some documentation of fitting the box frames and testing the tube lighting.

Filming has well and truly begun now - we are using two high wattage red head lights to capture all the details we need. As its all stop frame its laborious, but oh so fruitful! Most of the colour mastering will be done in post production so as long as we get the quality now, were set.

Initial footage looks great - the link to a very short test can be seen here: http://www.sendspace.com/file/196f3p

more soon...

No comments: